USB-A to USB-C Cable | 66W Fast Charging | Braided

    Description

    Charge your USB-C devices with a cable that fits your setup. This USB-A to USB-C Cable is built for everyday fast charging, whether you are using a USB-C wall charger, a desktop charging station, or a spare USB port on a power source.

    Choose the length that suits your space and the colour that matches your gear. For a full charging setup, browse our main collections here:

    Why choose this cable?

    • USB-A to USB-C connection for wide device compatibility
    • 66W fast charging with a compatible charger and supported device
    • Braided construction for everyday durability
    • Three useful lengths: 1m, 2m and 3m
    • Three colour choices: Black, White and Grey

    Best for

    • Charging phones, tablets and accessories
    • Using with USB-C wall chargers
    • Using with charging stations and desk chargers
    • Home, office, bedside and travel use

    Choose the right length

    Use 1m for tidy desk charging, 2m for everyday flexibility, and 3m when you need extra reach from a charger or charging station.

    Compatibility

    This cable is suitable for many USB-C devices. Charging speed depends on the charger, the device, and the cable length you choose. For the best result, pair it with a compatible USB-C charger or charging station from our ShopFam collections.

    Complete your setup

    Pair this cable with a compact wall charger for bedside use or a charging station for multiple devices:

    USB-A to USB-C Cable | 66W Fast Charging | Braided

      Product form

      Charge your USB-C devices with a cable that fits your setup. This USB-A to USB-C Cable is built for everyday... Read more

      • USB-A to USB-C cable for everyday charging
      • 66W fast charging with a compatible charger and device
      • Available in 1m, 2m and 3m lengths
      • Black, White and Grey colour options
      • Braided cable design for daily use

      £5.95

        • Guaranteed secure & safe checkout.

          shop pay
        • Free delivery on all orders above £10.00

        Description

        Charge your USB-C devices with a cable that fits your setup. This USB-A to USB-C Cable is built for everyday fast charging, whether you are using a USB-C wall charger, a desktop charging station, or a spare USB port on a power source.

        Choose the length that suits your space and the colour that matches your gear. For a full charging setup, browse our main collections here:

        Why choose this cable?

        • USB-A to USB-C connection for wide device compatibility
        • 66W fast charging with a compatible charger and supported device
        • Braided construction for everyday durability
        • Three useful lengths: 1m, 2m and 3m
        • Three colour choices: Black, White and Grey

        Best for

        • Charging phones, tablets and accessories
        • Using with USB-C wall chargers
        • Using with charging stations and desk chargers
        • Home, office, bedside and travel use

        Choose the right length

        Use 1m for tidy desk charging, 2m for everyday flexibility, and 3m when you need extra reach from a charger or charging station.

        Compatibility

        This cable is suitable for many USB-C devices. Charging speed depends on the charger, the device, and the cable length you choose. For the best result, pair it with a compatible USB-C charger or charging station from our ShopFam collections.

        Complete your setup

        Pair this cable with a compact wall charger for bedside use or a charging station for multiple devices:

        Returns & Delivery

        When will my order be delivered?

        We offer free delivery on orders over £10 through Royal Mail Economy, with delivery taking 2–4 working days. Orders placed Monday to Friday before 3 PM and Saturday before 12 PM are dispatched the same day. Orders placed after these times are sent the next working day. We currently deliver within the UK only.

        Can I cancel or change my order?

        Orders can be changed or cancelled before dispatch. Please contact us as soon as possible if you’d like to make any changes.

        Can I return my product?

        Yes, you can return your product if it’s faulty within 180 days, in accordance with UK consumer law. If the item is not faulty, it can be returned within 30 days, provided it’s in its original condition. In this case, the buyer is responsible for the return postage charges.

        What can I do if my item (or part of it) arrived damaged?

        If your item or any part of it arrives damaged, please contact us within 3 days of delivery and include clear photos of the packaging and the affected items showing the damage or issue. We’ll review the details and resolve the matter as quickly as possible.

        Popular Categories

        Recently viewed products

          © 2026 ShopFam, Powered by Shopify

            • American Express
            • Apple Pay
            • Diners Club
            • Discover
            • Google Pay
            • Klarna
            • Maestro
            • Mastercard
            • PayPal
            • Shop Pay
            • Union Pay
            • Visa

            Login

            Forgot your password?

            Don't have an account yet?
            Create account